A techno-economic & cost analysis of a turbine power plant: A case study for sugar plant
dc.authorid | Taner, Tolga -- 0000-0002-3065-1942 | |
dc.contributor.author | Taner, Tolga | |
dc.contributor.author | Sivrioğlu, Mecit | |
dc.date.accessioned | 13.07.201910:50:10 | |
dc.date.accessioned | 2019-07-29T19:26:38Z | |
dc.date.available | 13.07.201910:50:10 | |
dc.date.available | 2019-07-29T19:26:38Z | |
dc.date.issued | 2017 | |
dc.department | Teknik Bilimler Meslek Yüksekokulu | |
dc.description.abstract | A general model (sugar production processes) was developed based on data provided by a real plant and provided an exergy analysis. It was explored for a techno-economical turbine power plant and the improvement of performance indicators was achieved through thermoeconomic analysis. Unit cost for the turbine power plant is found to be 3.142 [$ / kW]. The simple payback period of the turbine power plant is calculated as 4.32 years. The purpose of this study is to reduce the cost of power plant. At the same time, this study poses a thermoeconomic analysis to increase turbine power. | |
dc.identifier.doi | 10.1016/j.rser.2017.04.104 | |
dc.identifier.endpage | 730 | en_US |
dc.identifier.issn | 1364-0321 | |
dc.identifier.scopusquality | Q1 | |
dc.identifier.startpage | 722 | en_US |
dc.identifier.uri | https://doi.org/10.1016/j.rser.2017.04.104 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12451/5663 | |
dc.identifier.volume | 78 | en_US |
dc.identifier.wos | WOS:000407185900051 | |
dc.identifier.wosquality | N/A | |
dc.indekslendigikaynak | Web of Science | |
dc.indekslendigikaynak | Scopus | |
dc.language.iso | en | |
dc.publisher | Pergamon-Elsevier Science | |
dc.relation.ispartof | Renewable & Sustainable Energy Reviews | |
dc.relation.publicationcategory | Makale - Ulusalarası Hakemli Dergi - Kurum Öğretim Elemanı | |
dc.rights | info:eu-repo/semantics/closedAccess | |
dc.subject | Turbine | |
dc.subject | Power Plant | |
dc.subject | Energy | |
dc.subject | Exergy | |
dc.subject | Techno-Economic Analysis | |
dc.title | A techno-economic & cost analysis of a turbine power plant: A case study for sugar plant | |
dc.type | Review Article |
Dosyalar
Orijinal paket
1 - 1 / 1
[ X ]
- İsim:
- taner-tolga-2017.pdf
- Boyut:
- 462.13 KB
- Biçim:
- Adobe Portable Document Format
- Açıklama:
- Tam Metin / Full Text